For Data Pump Export, the value that is specified for the parallel parameter should be less than or equal to the number of files in the dump file set. Each worker or Parallel Execution Process requires exclusive access to the dump file, so having fewer dump files than the degree of parallelism will mean that some workers or PX processes will be unable to write the information they are exporting. If this occurs, the worker processes go into an idle state and will not be doing any work until more files are added to the job. See the explanation of the DUMPFILE parameter in the Database Utilities guide for details on how to specify multiple dump files for a Data Pump export job.
For Data Pump Import, the workers and PX processes can all read from the same files. However, if there are not enough dump files, the performance may not be optimal because multiple threads of execution will be trying to access the same dump file. The performance impact of multiple processes sharing the dump files depends on the I/O subsystem containing the dump files. For this reason, Data Pump Import should not have a value for the PARALLEL parameter that is significantly larger than the number of files in the dump file set.
 
In a typical export that includes both data and metadata, the first worker process will unload the metadata: tablespaces, schemas, grants, roles, tables, indexes, and so on. This single worker unloads the metadata, and all the rest unload the data, all at the same time. If the metadata worker finishes and there are still data objects to unload, it will start unloading the data too. The examples in this document assume that there is always one worker busy unloading metadata while the rest of the workers are busy unloading table data objects.
 
If the external tables method is chosen, Data Pump will determine the maximum number of PX processes that can work on a table data object. It does this by dividing the estimated size of the table data object by 250 MB and rounding the result down. If the result is zero or one, then PX processes are not used to unload the table
 
The PARALLEL parameter works a bit differently in Import than Export. Because there are various dependencies that exist when creating objects during import, everything must be done in order. For Import, no data loading can occur until the tables are created because data cannot be loaded into tables that do not yet exist
阅读原文内容投诉

免责声明:

① 本站未注明“稿件来源”的信息均来自网络整理。其文字、图片和音视频稿件的所属权归原作者所有。本站收集整理出于非商业性的教育和科研之目的,并不意味着本站赞同其观点或证实其内容的真实性。仅作为临时的测试数据,供内部测试之用。本站并未授权任何人以任何方式主动获取本站任何信息。

② 本站未注明“稿件来源”的临时测试数据将在测试完成后最终做删除处理。有问题或投稿请发送至: 邮箱/279061341@qq.com QQ/279061341

软考中级精品资料免费领

  • 历年真题答案解析
  • 备考技巧名师总结
  • 高频考点精准押题
  • 2024年上半年信息系统项目管理师第二批次真题及答案解析(完整版)

    难度     813人已做
    查看
  • 【考后总结】2024年5月26日信息系统项目管理师第2批次考情分析

    难度     354人已做
    查看
  • 【考后总结】2024年5月25日信息系统项目管理师第1批次考情分析

    难度     318人已做
    查看
  • 2024年上半年软考高项第一、二批次真题考点汇总(完整版)

    难度     435人已做
    查看
  • 2024年上半年系统架构设计师考试综合知识真题

    难度     224人已做
    查看

相关文章

发现更多好内容

猜你喜欢

AI推送时光机
位置:首页-资讯-数据库
咦!没有更多了?去看看其它编程学习网 内容吧
首页课程
资料下载
问答资讯