文章详情

短信预约-IT技能 免费直播动态提醒

请输入下面的图形验证码

提交验证

短信预约提醒成功

ORA-00480: LCK* process terminated with error ORACLE 报错 故障修复 远程处理

2023-11-05 18:57

关注

文档解释

ORA-00480: LCK* process terminated with error

Cause: A system lock process died

Action: Warm start instance

ORA-00480用于表明连接空闲进程(LCK)失败

官方解释:

ORA-00480 LCKx process terminated with error

Cause: The LGWR, CKPT, or SMON processes detected an internal error and terminated abnormally.

Action: If this occurred during instance startup the instance may not be able to start. Try shutting down the machine and restarting it, or investigate the trace file while the instance is not running to get an idea of why the process terminated abnormally.

If it is not readily apparent why the process has terminated abnormally, contact your Oracle Support Services representative.

常见案例:

1、由于内存不足,以及加载程序段和逻辑对象有损坏,它可能导致连接空闲进程 (LCK*) 终止错误;

2、如果你使用标准维护方法,比如更新服务器,安装了新的硬件,或调整硬件设置,也会导致LCKX失败错误;

3、如果实例启动过程中出现这个错误,实例将无法完成启动。

正常处理方法及步骤:

步骤一:检查日志文件或跟踪文件,找出导致错误的原因。

步骤二:重新启动服务器。

步骤三:如果重启服务器不能解决问题,可能需要联系客服,排查问题。

阅读原文内容投诉

免责声明:

① 本站未注明“稿件来源”的信息均来自网络整理。其文字、图片和音视频稿件的所属权归原作者所有。本站收集整理出于非商业性的教育和科研之目的,并不意味着本站赞同其观点或证实其内容的真实性。仅作为临时的测试数据,供内部测试之用。本站并未授权任何人以任何方式主动获取本站任何信息。

② 本站未注明“稿件来源”的临时测试数据将在测试完成后最终做删除处理。有问题或投稿请发送至: 邮箱/279061341@qq.com QQ/279061341

软考中级精品资料免费领

  • 历年真题答案解析
  • 备考技巧名师总结
  • 高频考点精准押题
  • 2024年上半年信息系统项目管理师第二批次真题及答案解析(完整版)

    难度     813人已做
    查看
  • 【考后总结】2024年5月26日信息系统项目管理师第2批次考情分析

    难度     354人已做
    查看
  • 【考后总结】2024年5月25日信息系统项目管理师第1批次考情分析

    难度     318人已做
    查看
  • 2024年上半年软考高项第一、二批次真题考点汇总(完整版)

    难度     435人已做
    查看
  • 2024年上半年系统架构设计师考试综合知识真题

    难度     224人已做
    查看

相关文章

发现更多好内容

猜你喜欢

AI推送时光机
位置:首页-资讯-后端开发
咦!没有更多了?去看看其它编程学习网 内容吧
首页课程
资料下载
问答资讯