文章详情

短信预约-IT技能 免费直播动态提醒

请输入下面的图形验证码

提交验证

短信预约提醒成功

ORA-64203: Destination buffer too small to hold CLOB data after character set conversion. ORACLE 报错

2023-11-05 19:11

关注

文档解释

ORA-64203: Destination buffer too small to hold CLOB data after character set conversion.

Cause: An attempt was made to convert CLOB to CHAR, where the LOB size was bigger than the buffer limit for CHAR types or the CHAR buffer was not big enough to hold all data after character set conversion.

Action: Do one of the following:
* Make the LOB smaller before performing the conversion. for example, by using SUBSTR on CLOB
* Use DBMS_LOB.SUBSTR to convert CLOB to CHAR.

官方解释

ORA-64203: 在字符集转换后,目标缓冲区太小无法容纳 CLOB 数据。

这是一个缓冲区大小错误,发生在将CLOB数据从一个字符集转换为另一个字符集时。分配的缓冲区空间太小无法存储结果。

常见案例

假设在处理大型文本数据时,使用字符集转换的语法操作表中的CLOB列,出现以下错误:

ERROR at line 1:

ORA-64203: Destination buffer too small to hold CLOB data after character set conversion.

一般处理方法及步骤

1.正确识别和诊断错误原因如何出现此错误。

2.如果错误是由缓冲区限制引起的,可以尝试增加缓冲区大小。

3.可以尝试将字符串截断,以便它容易处理,然后将结果连接到一起,以及强制改变要处理的字符串的长度。

4.考虑重新审查代码,以检查是否有更好的方法来处理CLOB字段而避免任何缓冲区限制问题。

阅读原文内容投诉

免责声明:

① 本站未注明“稿件来源”的信息均来自网络整理。其文字、图片和音视频稿件的所属权归原作者所有。本站收集整理出于非商业性的教育和科研之目的,并不意味着本站赞同其观点或证实其内容的真实性。仅作为临时的测试数据,供内部测试之用。本站并未授权任何人以任何方式主动获取本站任何信息。

② 本站未注明“稿件来源”的临时测试数据将在测试完成后最终做删除处理。有问题或投稿请发送至: 邮箱/279061341@qq.com QQ/279061341

软考中级精品资料免费领

  • 历年真题答案解析
  • 备考技巧名师总结
  • 高频考点精准押题
  • 2024年上半年信息系统项目管理师第二批次真题及答案解析(完整版)

    难度     813人已做
    查看
  • 【考后总结】2024年5月26日信息系统项目管理师第2批次考情分析

    难度     354人已做
    查看
  • 【考后总结】2024年5月25日信息系统项目管理师第1批次考情分析

    难度     318人已做
    查看
  • 2024年上半年软考高项第一、二批次真题考点汇总(完整版)

    难度     435人已做
    查看
  • 2024年上半年系统架构设计师考试综合知识真题

    难度     224人已做
    查看

相关文章

发现更多好内容

猜你喜欢

AI推送时光机
位置:首页-资讯-后端开发
咦!没有更多了?去看看其它编程学习网 内容吧
首页课程
资料下载
问答资讯