文章详情

短信预约-IT技能 免费直播动态提醒

请输入下面的图形验证码

提交验证

短信预约提醒成功

Incorrect Cost for WIP Assembly Return 1

2023-06-05 13:13

关注
Incorrect Cost for WIP Assembly Return 1

Incorrect Costs For Wip Assembly Return To Discrete Job Using Average Costing (文档 ID 788680.1)Incorrect Cost for WIP Assembly Return 1

In this Document


Symptoms

Changes

Cause

Solution

References


Applies to:

Oracle Cost Management - Version 11.5.10.2 to 12.1.3 [Release 11.5 to 12.1]
Information in this document applies to any platform.

Symptoms


Find using the average cost method and our orgs are Project Manufacturing enabled. WIP Assembly returns to a job are supposed to be costs at the average unit value for completions from that job.
Material was issued to the job in the AUG-08 period at $2,774.81 and the job was fully completed (8 ea) at the same total cost in the same period.
In the following period (SEP-08), OSP resource costs of $1800 were received to the job. In an attempt to absorb this additional cost, all 8 were returned using the WIP Assembly return
transaction then all 8 were completed again using WIP Assy Completion transaction. Oracle costed the WIP assembly return at $0 cost.
This is incorrect. It should have returned 8 at $2,774.81 for a unit cost of $346.85. Then, the 2nd WIP assembly completion was costed at $4,574.81 ($2,774.81 + $1800) Essentially, the $2,774.81 material cost on the job was absorbed to inventory twice

EXPECTED BEHAVIOR
Expect ...8 returned at $2,774.81 for a unit cost of $346.85

-- Steps To Reproduce:
The issue can be reproduced at will with the following steps:
1. Open a standard discrete job in a manufacturing org using average cost method.
The routing should have an OSP resource requirement. the BOM should have one costed material component.
2. Issue material to the job and fully complete the job in one accounting period.
3. Close the accounting period
4. Receive OSP resource costs in the next period.
5. Do a WIP assembly return of all quantity completed. Then, do another final WIP assy completion

Changes

 

Cause

Code Issue

The material costs incurred against some operations (new operations) were not being relieved through the completion transactions

Solution

EBS 11.5.10.X

-- To implement the solution, please execute the following steps:


1. Download and review the readme and pre-requisites for Patch 7520866

bom patch/115/sql CSTLCACB.pls 115.6.115100.6 
bom patch/115/sql CSTLCASB.pls 115.3.115100.4 
bom patch/115/sql CSTPACCB.pls 115.17.115100.12 
bom patch/115/sql CSTPACSB.pls 115.8.115100.8


You can use the commands like the following:
strings -a $BOM_TOP/filename |grep '$Header'

5. Retest the issue.

6. Migrate the solution as appropriate to other environments.

---------------------------------------------------------------------


EBS 12.1.X

To implement the solution, please execute the following steps:


1) Please download and review the readme for Patch 11805897:R12.BOM.C


2) Please apply Patch 11805897:R12.BOM.C in a test environment.


3) Please confirm the following file versions:
CSTPACCB.pls 120.8.12010000.8
CSTPACSB.pls 120.2.12010000.4
CSTLCACB.pls 120.2.12010000.4
CSTLCASB.pls 120.1.12010000.3


4) Please retest the issue.


5) If the issue is resolved, please migrate the solution as appropriate to other environments.


阅读原文内容投诉

免责声明:

① 本站未注明“稿件来源”的信息均来自网络整理。其文字、图片和音视频稿件的所属权归原作者所有。本站收集整理出于非商业性的教育和科研之目的,并不意味着本站赞同其观点或证实其内容的真实性。仅作为临时的测试数据,供内部测试之用。本站并未授权任何人以任何方式主动获取本站任何信息。

② 本站未注明“稿件来源”的临时测试数据将在测试完成后最终做删除处理。有问题或投稿请发送至: 邮箱/279061341@qq.com QQ/279061341

软考中级精品资料免费领

  • 历年真题答案解析
  • 备考技巧名师总结
  • 高频考点精准押题
  • 2024年上半年信息系统项目管理师第二批次真题及答案解析(完整版)

    难度     813人已做
    查看
  • 【考后总结】2024年5月26日信息系统项目管理师第2批次考情分析

    难度     354人已做
    查看
  • 【考后总结】2024年5月25日信息系统项目管理师第1批次考情分析

    难度     318人已做
    查看
  • 2024年上半年软考高项第一、二批次真题考点汇总(完整版)

    难度     435人已做
    查看
  • 2024年上半年系统架构设计师考试综合知识真题

    难度     224人已做
    查看

相关文章

发现更多好内容

猜你喜欢

AI推送时光机
位置:首页-资讯-后端开发
咦!没有更多了?去看看其它编程学习网 内容吧
首页课程
资料下载
问答资讯