SAP PP What is MRP Area And How Is It defined

2023-06-05 13:38

关注

Whatis MRP Area And How Is It defined

http://www.erpgreat.com/production/what-is-mrp-area-and-how-is-it-defined.htm

 

What is MRP Area And How Is It defined


 

What is MRP Area. How it is defined? What are the points to be considered while defining a MRP Area?

The MRP area is an organizational unit for which material requirements planning can be carried out independently outside of total plant level MRP run which is done using MD01 for entire plant. by creating a specific scope of planning and is maintained in the MRP view of the material master


But first you need to create it in SPRO and if needed assign the storage locations or materials masters to the mrp area and MRP with MRP areas for the material is not activated until the material has been assigned to an MRP area. If you have not assigned a material to an MRP area, that is, you have not created an MRP area segment in the material master, the material will continue to be planned in the plant MRP area only.


Basically, there are three types of MRP area:


1. Plant MRP Area

The plant MRP area initially contains the plant together with all its storage locations and stock with subcontractors.  When you have defined the other 2 types of MRP areas for storage locations and for subcontractors and you have assigned the materials, the plant MRP area is reduced by exactly this number of subcontractors and storage locations. This is because they are now to be planned separately.


2. MRP Areas for Storage Locations

You can define an MRP area that consists of a particular storage location, by creating an MRP area and assigning the storage location to it. Material requirements for this storage location are then planned separately from the rest of the plant.

You can also group several storage locations into one MRP area, by creating an MRP area and assigning the storage locations to it. These storage locations are then planned together.


3. MRP Areas for Subcontractors

You can also define an MRP area for each subcontractor.

A subcontractor may be assigned to only one MRP area. 


Advantages of using MRP area and highlights.

1. You can carry out MRP specifically for the determined MRP areas. This enables you to carry out differentiated material requirements planning.

2. Finished products and important assemblies intended for make-to-order or engineer-to-order production are always planned in the plant MRP area

3. The planning run takes into account the planning with MRP areas as follows:

4. If you do not enter a separate scope of planning, the system plans the whole plant, that is, all MRP areas in the plant, during the total planning run. If you want to carry out a total planning run for a particular MRP area only, you must specify the required MRP area in the scope of planning.

5. During single-item, multi-level planning, the system plans the selected material in the MRP area entered. In addition, the system takes into account planning file entries from other MRP areas, for example, if the material is to be procured using stock transfer.

6. During single-item, single-level planning, the system plans the selected material in the MRP area entered only.


Now, for running the cycle for MRP areas, we need to define in SPRO.


IMG -> Production Planning -> MRP -> Master data -> Define MRP Areas

Specify Area types 

01 - Plant MRP Area,

02 - Storage Location MRP Area

03 - Sub contractor MRP Area.

After defining MRP area, assign the material to the specific MRP area in the MRP1 view of the Material master and define the MRP1 & 2 views specific for those areas.

Enter the requirements for the specific MRP areas, if you do not enter the MRP area, MRP area by default will be picked as Plant MRP area.

Also, need to run MRP, by entering appropriate MRP area.

Stock/Rqmts list to be selected by entering the MRP area in the selection screen.

 

阅读原文内容投诉

免责声明:

① 本站未注明“稿件来源”的信息均来自网络整理。其文字、图片和音视频稿件的所属权归原作者所有。本站收集整理出于非商业性的教育和科研之目的,并不意味着本站赞同其观点或证实其内容的真实性。仅作为临时的测试数据,供内部测试之用。本站并未授权任何人以任何方式主动获取本站任何信息。

② 本站未注明“稿件来源”的临时测试数据将在测试完成后最终做删除处理。有问题或投稿请发送至: 邮箱/279061341@qq.com QQ/279061341

软考中级精品资料免费领

  • 历年真题答案解析
  • 备考技巧名师总结
  • 高频考点精准押题
  • 2024年上半年信息系统项目管理师第二批次真题及答案解析(完整版)

    难度     813人已做
    查看
  • 【考后总结】2024年5月26日信息系统项目管理师第2批次考情分析

    难度     354人已做
    查看
  • 【考后总结】2024年5月25日信息系统项目管理师第1批次考情分析

    难度     318人已做
    查看
  • 2024年上半年软考高项第一、二批次真题考点汇总(完整版)

    难度     435人已做
    查看
  • 2024年上半年系统架构设计师考试综合知识真题

    难度     224人已做
    查看

相关文章

发现更多好内容

猜你喜欢

AI推送时光机
位置:首页-资讯-后端开发
咦!没有更多了?去看看其它编程学习网 内容吧
首页课程
资料下载
问答资讯